In this post, we are going to know about What is Work Method Statement (WMS) | Safe Work Method Statement (SWMS).
What is Work Method Statement (WMS)?
It is the document Submitted by Contractor to Client, covering the general Work procedure of a particular job in a safe manner as per the standards.
Work Method Statement (WMS) is also known as Safe Work Method Statement (SWMS).
What is the use of Work Method Statement (WMS)?
- To Plan and execute the work easily and safely,
- It also helps to know the codes and standards used for each activities.
What are the contents in WMS?
1.0 Scope
2.0 Purpose
3.0 Definitions
4.0 References
5.0 Responsibilities
- Project Manager
- Construction Manager
- HSE Manager
- Safety Officer
- Project Site Engineer
- Site Supervisor/Foreman
- Quality Control Inspector
6.0 Equipment
7.0 Materials
8.0 PPE
9.0 Safety
10.0 Safety Procedure
11.0 Operational Procedure
12.0 Inspection & Testing
13.0 Attachments
- Forms
- Documents
- Records
I hope, you understand about Work Method Statement (WMS).